Transportation Investment Generating Economic Recovery (TIGER) Grant Application for US 78 road improvements.

The purpose of the project is to improve safety conditions, increase traffic capacity, and improve traffic flow.


PHASE 1 (COMPLETED)

•From near S-18-167 (Sugarhill Road) in St. George to approximately 0.8 miles west of US 178, resurface and provide 4-foot paved shoulders and 6-foot grass shoulders.

•Construct 3-lane section with curb & gutter on both sides and sidewalk on one side (resident side) through town of Dorchester.

•Length - 11.47 miles.


PHASE 2

• From approximately 0.8 miles west of US 178 to approximately 0.5 miles west of SC 27 North, resurface and provide 4-foot paved shoulders and 6-foot grass shoulders.

• From approximately 0.5 miles west of SC 27 North, begin Passing Area to approximately 0.2 miles east of SC 173, widen from 2 to 5 lanes, and provide 4-foot paved shoulders and 6-foot grass shoulders.

• From 0.2 miles east of SC 173, taper from 5 lanes to 3 lanes. Construct a 3-lane section with 4-foot paved and 6-foot grass shoulders to approximately 0.15 miles east of S-18-630 ( Campbell Thicket Road).

• Realign intersection with US 178, providing left and right turn lanes.

• Provide left turn lane from US 78 onto US 178.

• Construct new road to Water Wheel Road and align with entrance for Green Acres. Provide left turn lane from US 78 onto Water Wheel Road.

• Possible construction of turning lanes at landfill. This is to be determined at a later date.

• Length – 7.0 miles.


PHASE 3

• From approximately 0.15 miles east of S-18-630 to 0.5 miles west of S-18-22 ( Orangeburg Road), resurface and provide 4-foot paved and 6-foot grass shoulders.

• From 0.5 miles west of S-18-22 to approximately 0.2 miles west of S-18-58 ( Jedburg Road), begin widening from 2 to 5 lanes with 4-foot paved and 6-foot grass shoulders.

• From approximately 0.2 miles west of S-18-58 to S-18-165 ( W. Richardson Avenue), widen from 2 to 5 lanes curb & gutter section, accommodating bicycles and providing sidewalk on one side only.

• Length – 6.06 miles.


PROJECTED CONSTRUCTION START DATES

•Phase 1 - Completed
•Phase 2 - To be determined
•Phase 3 - To be determined

Last updated: 3/2/2017 3:00:47 PM